Function diagram for switching functions III and IV
6. Commissioning / operation
After mounting, wiring and setting check whether the unit operates correctly.
7. Maintenance, repair, disposal
In case of correct use no maintenance measures are necessary.
Depending on the switching rate to be expected and the load to be switched,
we recommend testing the relay contacts.
Only the manufacturer is allowed to repair the unit.
After use dispose of the unit in an environmentally friendly way according to
the valid national regulations.
24
PULSE EVALUATION SYSTEM D100
1) 1) power-on delay time
Kommentare zu diesen Handbüchern